Oct 26, 2011 | Educational
The project consisted of three phases. Phase I included site storm-water, utility, and sanitary upgrades on the east side of the campus. Phase II was a new 3,000 SF Athletic Concessions and Restroom facility fully air conditioned to serve both the football and...
Sep 26, 2011 | Projects, Residential
Sanctuary by the Sea is a haven of awe-inspiring splendor. This exclusive gated community has over 650 feet of frontage on the Gulf of Mexico and is nestled by Redfish Lake and a stunning private nature preserve. With only 82 condominium residences on 23 secluded...
Sep 26, 2011 | Commercial, Projects
The project consists of three phases of work. Phase I included the site infrastructure for the 4-acre site and a 4,500 sf. office building with a third-story lookout tower. Phase II consists of a 30,000 sf dry storage facility with retail, restaurant, gathering room,...